Fish Passage Plan (FPP) change forms 2007 - 2012

Ordered by section

Appendices (App)
Appendix A Special Projec Operations and Studies (no change forms)
Appendix B Corps of Engineers Juvenile Fish Transportation Plan Appendix C Bonneville Power Administration's System Load Shaping Guidelines Regarding Trubine Operation and Best Efficiency
Appendix D Corps of Engineers Plan of Action for Dissolved Gas Monitoring
Appendix E Operations RElated to Project Spill for Fish Passage and Transportation (aka Fish Operations Plan or FOP)
Appendix F Guidlines for Dewatering and Fish Handling Plans
Appendix G Protocols for Adult Fish Trapping Operations and Bonneville, Ice Harbor, and Lower Granite Dams
BON AFF
09AppG001 Appendix G lamprey trapping at 70-72F
08AppG001 Appendix G lamprey trapping at 70-72F
09AppG004 Appendix G lamprey holding
08APPG 002 Appendix G flume
11AppGBON003 brailpool
10AppGBON004 right to terminate
11AppGBON002 lower exit bulkhead
09AppG005 Appendix G valve correction
12AppGBON001 BON AFF fish over 100
10AppGBON001 numbers of fish in tanks
09AppG006 critfc changes to sections 3 and 4
10AppGBON002 section 3.9
10AppGBON003 temperature protocols
09AppG002 Appendix G BON AFF Adult trapping temps
11AppGBON001 picket lead density
09AppG003 Appendix G BON AFF picket lead

Appendix H Turbine Dewatering Procedure for Chief Joseph Dam
Appendix I Dworshak Fish Protection Procedures for Turbine Maintenance
Appendix J Protocols for Juvenile Montiroing Facility Operations at Bonneville Dam
11AppJ002 2.14 hydrocannon  
08APPJ001 Appendix J  
08APPJ002 Appendix J 3.g PSMFC  
09AppJ001 Appendix J temperature protocols  
10AppJ001 high temp sampling protocols  
11AppJ001 High Temp-additional sampling  
Appendix K Protocols for Smolt Monitoring Facility Operations at John Day Dam
08APPK001 Appendix K  
09AppK001 Appendix K temperature protocols  
08APPK002 Appendix K  
10AppK001 high sampling protocols  
11AppK001 High Temp-addtional sampling  
 
Appendix L Diel Fish Graphs
09AppL001 fish passage graphs